07/23/2026
Main grooming area walls pretty much done. Ceiling is next!
With all the insulation and boards I have put up, there is at least an inch of extra on all walls and floor making it very insulated. It will stay cooler in the summer and it will not let any freezing air in during winter.
I am also going to build a counter for up front with cabinets for my tools and stuff. And I am going to put sliding doors on the bottom part of the tub for extra storage space.
My vision is coming to fruition.